60 Ton Gantry Crane

60 ton gantry crane has strong structure and good performance. It belongs to heavy duty gantry crane. We in addition, it has various types about gantry crane design. As the professional and excellent crane customers, you can learn more lifting equipment working principles from professional supplier. Of course, we can provide you with more detailed information and training management courses. As we know, first of all, customers find out simple operation way of crane.

As time passed time, we learn professional methods and advanced technology. It also includes the research and development from everyone for higher life. Thus, our life change other building design and enhance our working efficiency. If you still learn specific operational information, please get in touch with us as soon as possible. We will spare no effect to help you. If you have spare time, welcome to visit our factory in China. We will provide the customers professional crane knowledge and training.

60 ton gantry crane of Parameters

60 ton gantry crane for sale
Popular 60 Ton Gantry Cranes for Sale

  • Lifting capacity: 5-500t
  • Span length: 18-35m
  • Lifting height: 6-18m
  • Lifting speed: 1.5-11.5m/min
  • Trolley speed: 10-40.1m/min
  • Crane travelling speed: 16-50m/min
  • Working class: A3-A7
  • Customized service

Working Principles of 60 Ton Gantry Crane with An Excellent Design

Gantry crane working principles are not complicated for various types. In fact, it consists of the main three parts. The main structure of the crane consists of a beam suspended between the two legs. At the bottom of each leg, you can find the wheel and let it have time to move on a solid ground or some track, which depends on the shape of the crane. The goal of these wheels allows the crane to move forward and backward, or to the front, back, left and right of the entire building or loading dock. Connected to the center beam is a trolley that can move back and forth along the size of the beam. This type of trolley allows the crane operator to transfer the load on one end of the crane to the other end.

60 ton gantry crane of Parameters

60 ton crane
60 ton gantry crane for sale

  • Lifting capacity: 5-500t
  • Span length: 18-35m
  • Lifting height: 6-18m
  • Lifting speed: 1.5-11.5m/min
  • Trolley speed: 10-40.1m/min
  • Crane travelling speed: 16-50m/min
  • Working class: A3-A7
  • Customized service

60 Ton Gantry Crane Design and Installation

If the main beam is not assembled, the site should be selected at the correct construction places. The several bridges should be connected together by pre-installed bolts. When connecting, use the paved cart running track as a horizontal reference. Place the main beam on the rail or on the shelf. It is preferably placed on the support side for attachment to the legs. The level of the trolley track on the support surfaces at both ends is measured by a water level gauge. If it is a single beam, there is only one track. Just find the same height at each end. If it is a double beam and there are two tracks, you need to find the same height at the four points on both ends. Taking these two or four points as zero points, and according to the technical requirements, we use the jack to pad out the parabolic mid-upper crown and the upward tilt of the cantilever end. When arching and warping, the box beam should be placed under the large box, and the truss beam should be placed at the joint. The I-beam under the trolley track should be well padded. After the technical requirements are met, it tightens the bolts at the main beam joint.

Excellent gantry crane of Parameters

60 ton crane
60 ton double girder gantry crane

  • Lifting capacity: 5-500t
  • Span length: 18-35m
  • Lifting height: 6-18m
  • Lifting speed: 1.5-11.5m/min
  • Trolley speed: 10-40.1m/min
  • Crane travelling speed: 16-50m/min
  • Working class: A3-A7
  • Customized service

Wide Applications and Benefits of 60 Ton Gantry Crane

For different applications, as the professional manufacturer and supplier, we can provide the customers with single girder and double beam gantry crane. They has their own functions and benefits. Compared to other gantry cranes, owing to light weight, it has simple operation and convenient transportation. When you need to move the machine, you can have less time to operate it. In order to operate the lifting equipment, operators need links to other devices. In suitable position, we choose the key parts to install our products. For heavy item, you can imagine how hard they are lifted up and down. However, we can consider the correct crane to move the various materials. It is very important for today’s industries to purchase the right gantry cranes. Although our cranes’ working principles are simple, construction operations are often very flexible. If you have time, you can visit our website and factory in China. We can help you understand these working principles of gantry cranes. In addition, you will learn more abilities and cost-effectively operation for different gantry cranes.

60 ton gantry crane of Parameters

60 ton gantry crane
60 ton double girder gantry crane for sale

  • Lifting capacity: 5-500t
  • Span length: 18-35m
  • Lifting height: 6-18m
  • Lifting speed: 1.5-11.5m/min
  • Trolley speed: 10-40.1m/min
  • Crane travelling speed: 16-50m/min
  • Working class: A3-A7
  • Customized service

Various Kinds of 60 Ton Gantry Crane from Professional Supplier 

Our company’s cranes has various types and tons. 60 ton gantry crane has strong structure and many advantages with low noise and good performance. In addition, it can work in different working places according to national standard. We can provide the high quality products and excellent service. If you want to customize the gantry cranes, you can tell us your ideals and suggestions. If you want to learn more information, please contact us as soon as possible. Generally speaking, we  not only provide the excellent training, but also meet your requirements about adding other lifting equipment.  If you have time, welcome to get in touch with us as soon as possible.

Professional gantry crane of Parameters

Reliable 60 Ton Gantry Crane Supplier for Sale
Reliable 60 Ton Gantry Crane Supplier for Sale

  • Lifting capacity: 5-500t
  • Span length: 18-35m
  • Lifting height: 6-18m
  • Lifting speed: 1.5-11.5m/min
  • Trolley speed: 10-40.1m/min
  • Crane travelling speed: 16-50m/min
  • Working class: A3-A7
  • Customized service

60 Ton Gantry Crane Inspection

Before the gantry crane is erected, it is necessary to prepare for the reliability of all lifting equipment and site safety. Its erection work is much larger than that of a bridge crane, and there are many erection methods.

  1. Use a single mast to erect

First bundle the trolley on the installed main beam rail, and consider the center of the bridge when binding. When the bridge rises to a height slightly higher than the height of the legs, the pre-installed rigid legs and flexible legs are respectively translated along the track to the lower side of the bridge, the bridge is lowered, and the bolts or rivets are used to fasten and connect.

  1. Erect with double mast

First, tie the trolley to the main beam rail of the installed bridge. After lifting the bridge to a little higher than the design elevation, pull up the rigid legs and flexible legs, put down the bridge, and fasten them with bolts or rivets.

Technical Parameter of  AQ-MG Double Girder Gantry Crane
Capacity t 5 10 16 20 32
Span S(m) 18~35 18~35 18~35 18~35 18~35
Lifting height m 6~18 6~18 6~18 6~18 6~18
Lifting speed m/min 11.5 8.5 7.9 7.2 6
Trolley speed m/min 37.2 37.4 40.1 40 37
Crane speed m/min 37.7 37.7 40.1 40.1 38
Work duty A3-A7 A3-A7 A3-A7 A3-A7 A3-A7
Track type P43 P43 P43 QU70 P43 QU70 P50 QU80
Capacity t 50 75 100 160 200
Span S(m) 18~35 18~35 18~35 18~35 18~35
Lifting height m 6~18 6~18 6~18 6~18 6~18
Lifting speed m/min 5.9 4.7 3.9 3.5 3.5
Trolley speed m/min 31.3 38.2 33.9 22.5 29
Crane speed m/min 44 38.3 32.3 28 28
Work duty A3-A7 A3-A7 A3-A7 A3-A7 A3-A7
Track type QU80 QU80 QU100 QU100 QU100
Capacity t 250 320 400 450 500
Span S(m) 18~35 18~35 18~35 18~35 18~35
Lifting height m 6~18 6~18 6~18 6~18 6~18
Lifting speed m/min 2.2 2.3 1.5 1.5 1.5
Trolley speed m/min 28 16.6 10 10 11.5
Crane speed m/min 50 28 18 18 16
Work duty A3-A7 A3-A7 A3-A7 A3-A7 A3-A7
Track type QU120 QU120 QU120 QU120 QU120
  1. When erecting with a mobile crane, first lift one end of the bridge and pad the bracket at the other end. If it is difficult to pad up once, you can use the sleeper to layer up until it is slightly higher than the design elevation, then pull up the legs, translate it under the bridge, put down the bridge, and fasten it with bolts or rivets. If two mobile cranes are used, the bridge can be lifted from both ends and placed on the legs.

If conditions permit, it is best to attach the cab to the cart or main beam after the bridge has risen to a certain height from the ground.

    Please feel free to give your inquiry in the form below.
    We will reply in 24 hours.